Cyberduck Mountain Duck CLI

Timeline


and

Mar 31, 2012:

11:59 AM Ticket #6612 (Lion port 21 closed) created by chrispl0
Hi there Can you tell me how to open port 21 in apple Lion so I can …
2:21 AM Ticket #6611 (WebDav problem) created by massimiliano.rizzato
Hi, After connecting to the following server (webdav): …

Mar 30, 2012:

1:00 PM Ticket #6604 (Invalidation Issues) closed by dkocher
worksforme: You have multiple download distributions set up for the same bucket. …
12:52 PM Ticket #6608 (DAV download fails with error "Unsupported Content-Coding: unknown.") closed by dkocher
duplicate
12:36 PM Changeset [9494] by dkocher
  • trunk/source/ch/cyberduck/core/Transfer.java
12:36 PM Ticket #6440 (copy folder from server to server) closed by dkocher
fixed: In r9493.
12:35 PM Changeset [9493] by dkocher
  • trunk/source/ch/cyberduck/core/CopyTransfer.java
Fix #6440.
12:34 PM Changeset [9492] by dkocher
  • trunk/source/ch/cyberduck/ui/cocoa/UserDefaultsPreferences.java
Fix running in tests.
12:33 PM Changeset [9491] by dkocher
  • trunk/build.xml
  • trunk/test/ch/cyberduck/core/AbstractTestCase.java
Fix tests.
6:06 AM Changeset [9490] by dkocher
  • trunk/source/ch/cyberduck/core/Native.java
Fallback when running in tests.
Note: See TracTimeline for information about the timeline view.
swiss made software